Week 2/6 to 2/10
2/6= I had started to place bamboos on top of the shed for the roof. We had about 5 people working with us. 2 grabbed and measured the bamboo, then another cuts, then hands it to to guys on ladders which placed it on the roof. In that one day, we got through cutting and placing the would on one quarter of the roof.
2/6= I had started to place bamboos on top of the shed for the roof. We had about 5 people working with us. 2 grabbed and measured the bamboo, then another cuts, then hands it to to guys on ladders which placed it on the roof. In that one day, we got through cutting and placing the would on one quarter of the roof.
2/7= Using the same process as the last day. Me and a 4 others filled the second quarter of the roof with bamboo. The process was a efficient and simple process but we ran out of bamboo at the end.
2/8= I had worked on framing the tool closet and placed the roof. Me and my teacher had measured for the frame of the roof and the cut them out of plywood. Then we installed the pieces with nails to create it.
2/9=On thursday, I mainly work on the new planter box. I made it stable enough to last and not be moved. I also filled up the new planter box with soil from the old planter box.
2/10= On friday, I measured for a new bench for a new bench. I grabbed two different students to start digging. We made some progress on it but did not finish it.
Week 2/11 to 2/13
2/11= On monday, we kept on working on the new bench. We really focused on digging them in the correct spots, also we had to make them 18 inches deep and make the bottom flat enough to place a sonic tube in it.
2/11= On monday, we kept on working on the new bench. We really focused on digging them in the correct spots, also we had to make them 18 inches deep and make the bottom flat enough to place a sonic tube in it.
2/12= On Wednesday, we filled the excess holes surroundings with dirt. We then filled the inside of the tubes with rocks then placed the bench inside the sonic tubes to have it raise 15 inches above the ground. Then we leveled it and filled it with cement.
2/13= On Thursday, a couple people and I had started to create the door for the tool closet. We first measured out the space for the door then cut out plywood and supported it with 2X2's. Then we installed it with hinges onto the closest.
2/18= On Wednesday I worked on cleaning up and building work tables. That day I took out the weak and beat up sides of the tables and hammered in some new sides to the tables. Then others had painted the tables. Unfortunately I was only able to take one photo.
2/19= On Thursday I worked on creating some racks on top of the shed to use for placing PVC pipes. The racks ran all the way to the end of the shed and really made the area and shed look cleaner and nicer.
2/20= On Friday I worked on creating selves for the tool closet. I framed out the plywood and, leveled out the racks, then I drilled in the plywood.
2/23= On Monday I starred putting a design on the edges of the roof for the outside area. I used a jigsaw to cut through the wood.
2/24= On Tuesday I continued on designing the roof corners. I finished on the framing but it looked very rough at the end.
2/25= On Wednesday I got a electronic sanding machine and started sanding the corners to give it a smoother finish. I made the design look so much cleaner.
3/3= On Monday we started to take some of the single bamboo plant apart and move them all together. It opened up more room and makes the area look cleaner.